Connecting the World to Make It Easier to Live In
We empower better quality of life and economic growth while leading change to make the world a better place.
POSCO E&C is contributing to the development of the nationand local communities by making a conspicuous figure in virtuous cycle of resources, such as infrastructure that
acts as the basisfor various industrial activities like roads, railroads, ports,and bridges, as well as water treatment and waste-to-energy facilities in Korea and abroad.
Jido-Imjado Bridge
Construction Project, Korea
(1st and 2nd Imja bridges)
POSCO E&C’s first cable stayed
bridge over the sea that improved transportation in island regions.
Jido-Imjado Bridge Construction Project, Korea was the first
cable stayed bridge built over the sea that reduced the travel time
from one hour by a vessel to five minutes by car, significantly improving the transportation system for local island residents.
In addition, POSCO E&C used high-strength steel and won the Best Construction Project Award in a Symposium held by the Korean
Society of Steel Construction.
CLIENT
IKSAN REGIONAL CONSTRUCTION AND MANAGEMENT ADMINISTRATION
TYPE
ROAD CONSTRUCTION
(L=4.99km(2 LANES),
CABLE-STAYED BRIDGE 2EA: L=1,885m,INTERSECTION 3EA)
CONSTRUCTION PERIOD
2013.10 –2021.3
East Breakwater Construction Works For The Ulsan Port
Building of the world-class oil hub
in Ulsan port.
The 1.42km breakwater facility in the new southern port of Ulsan along the coast of
Ulsan is a project to protect the second Northeast Asia oil hub business complex from
the mighty waves that come from the southeast.
Once the breakwater facility is built, the second phase of the oil hub
project will gain momentum, safeguard moored vessels and nearby
facilities from sea waves, and make it more convenient for visitors
to use the facility.
CLIENT
ULSAN REGIONAL OFFICE OF OCEANS AND FISHERIES
TYPE
CONSTRUCTION OF THE BREAKWATER (1,411m
(CAISSON 47EA), DCM 1 LOT,MISCELLANEOUS 1 LOT)
CONSTRUCTION PERIOD
2016.11-2022.6
Waste-to-Energy Plant in Krakow, Poland
The biggest Waste-to-Energy
facility in Poland. This facility
generates Electric power and
heat using wastes.
It has the uninjury record during construction and green energy certification. Also, it is operating smoothly without defects.
in Poland. This facility generates
Electric power and heat using
wastes. It has the uninjury record
during construction and green
energy certification. Also, it is
operating smoothly without defects.
The Krakow waste incinerator in Poland is the largest waste treatment plant in the country that can process 220,000 tons of municipal waste in a year. They then use the energy obtained in the process to provide electricity and heat to nearby areas.
POSCO E&C received the zero defects, zero accidents certification in
the safety and environmental assessment by the Krakow City Labor
Office and another inspection by the regional Environmental Protection Agency thanks to their systematic control of factory systems that
complies with the European environmental standards.
CLIENT
K.H.K (Krakowski Holding Komunaly S.A)
TYPE
WASTE TREATMENT POWER PLANT(220,000ton/year
(340ton/DAYx2 LANE),
POWER GENERATION : 10.7MWh)
CONSTRUCTION PERIOD
2012.10–2016.6
Donghae Nambu Line(Railroad) Deokha train depot
The largest railway vehicle base
in Korea.
Busan-Ulsan Deokha vehicle base on the Donghae Nambu line
is the railway facility that manages trains that travel along the Donghae Line, Jungang Line, and the Daegu Metro line.
The railway vehicle base built on a land area of 34,198m2 is comprised
of a low-maintenance plant where they conduct daily inspections like
simple checks and cleaning, a high-maintenance plant where they disconnect and examine trains that have reached the inspection cycle,
and a management building that supervises the entire vehicle base,
and 13 attached buildings.
CLIENT
NATIONAL RAILROAD CORPORATION
TYPE
RAILWAY (TRAIN 28 VEHICLE DEPOT, ANCILLARY FACILITIES FOR VEHICLE DEPOT)
CONSTRUCTION PERIOD
2014.5-2021.6
Roads
INCHEON—GIMPO EXPRESSWAY
CLIENT
INCHEON GIMPO EXPRESSWAY CO.,LTD.
TYPE
HIGHWAY ROAD CONSTRUCTION(L=3.6km, TUNNEL 1EA : 3,600m)
CONSTRUCTION PERIOD
2012.3- 2017.3
DONGHONGCHEON—YANGYANG EXPRESSWAY
CLIENT
KOREA EXPRESSWAY CORPORATION
TYPE
HIGHWAY ROAD CONSTRUCTION(L=5.62km(4 LANE), YEONGDEOK3 TUNNEL : 1,311m, BRIDGE : 900m,TUNNEL 3EA : 1,640m,BRIDGE 9EA : 1,268m, IC : 1EA)
CONSTRUCTION PERIOD
2009.3- 2017.7
CONSTRUCTION WORKS FOR REHABILITATION OF NATIONAL ROAD N104 BETWEEN NAMPULA AND NAMETIL INNAMPULA PROVINCE—MOZAMBIQUE
CLIENT
ANE
TYPE
REHABILITATION OFNATIONAL ROAD(UNPACKAGED → DBST, 2LANE,L=70.6km, BRIDGE(6EA, L=130m)
CONSTRUCTION PERIOD
2018.1- 2020.7
Offshore
GUMI HIGH—TECHVALLEY SITEBUILDING WORK
CLIENT
KOREA WATER RESOURCES CORPORATION
TYPE
AREA =3,754,467m2, BRIDGE 13
CONSTRUCTION PERIOD
2012.4- 2021.4
LONG SON PETROCHEMICAL COMPLEX PACKAGEF–PORT IN VIETNAM
CLIENT
Long Son Pertochemicals
TYPE
JETTY 1,500 DWT—100,000 DWTT(2 BERTHS),TRESTLE 1.93km,DREDGING 13,000,000m2
CONSTRUCTION PERIOD
2018.9- 2021.9
TAKORADI T2EXPANSION PROJECTIN GHANA
CLIENT
KOREA ELECTRIC POWERTECHNOLOGY
TYPE
WATER INTAKE & DRAIN PIPE 1 LOT
CONSTRUCTION PERIOD
2012.7- 2014.6
Water · Environment
ANYANG SAEMUL PARK(SEWAGE AND SLUDGETREATMENT PLANT)
CLIENT
ANYANG CITY WATER ANDSEWERAGE OFFICE
TYPE
SEWAGE TREATMENT PLANT : 250,000m2SLUDGE TREATMENT ANDDRYING FACILITIES
CONSTRUCTION PERIOD
2018.2- 2020.12
CHUNGNAM PROVINCIAL GOVERNMENT NEW TOWN AUTOMATIC COLLECTION FACILITY
CLIENT
CHUNGNAM PROVINCIAL GOVERNMENT DEVELOPMENT CORPORATION
TYPE
DEPOSITORY: 2 PLACES, TRANSPORT PIPELINE: 40km
CONSTRUCTION PERIOD
2010.10 - 2018.9
GWANGJU COMBUSTIBLE WASTE
CLIENT
CHUNGJUNG BITGOEUL CO., LTD.
TYPE
HOUSEHOLD WASTE (800ton/day)SOLID FUEL(SRF) PRODUCT MANUFACTURING
CONSTRUCTION PERIOD
2013.12- 2016.11
LAOS NAM LIK 1 HEPP (HYDROELECTRIC POWER PLANT)
CLIENT
NL1PC
TYPE
HYDRO POWER PLANT(H=48.7m. L=149m,WATER TUNNEL L=310m,GENERATOR 32.25MW*2EA, TRANSMISSION LINE 11km)
CONSTRUCTION PERIOD
2014.5- 2019.2
SEMANGKA HYDRO-ELECTRIC POWER PROJECT IN INDONESIA
CLIENT
PT. TEP (Tanggamus Electric Power)
TYPE
55.4MW HYDRO POWER PLANT(WEIR H 8m, TUNNEL 1,248m, WATERWAY 5.0km, POWERHOUSE 1 LOT)
CONSTRUCTION PERIOD
2015.2- 2017.11
GREATER YANGON WATERSUPPLY IMPROVEMENT PROJECT
CLIENT
YANGON CITY DEVELOPMENT COMMITTEE
TYPE
ADDITIONAL FACILITIES IN THE EXISTINGWATER TREATMENT PLANT ANDNEW STORAGE TANK SUPPLY(3 PUMP FACILITIES, DISINFECTION FACILITIES 4EA MANAGEMENT BUILDING 1EA, STORAGE TANK 2EA 22,000m2, 28,000m2)
CONSTRUCTION PERIOD
2018.1- 2021.8
RailwaysㆍSubways
SEONGNAM TRAIN DEPOT
CLIENT
KOREA RAILROAD AUTHORITY
TYPE
RAILWAY (AREA: 278,436m2,SERVICE LINE: 1.84km,VEHICLE DEPOT: 1.13km, 12 QUARRY LINES, INSPECTION, CONSTRUCTION, ELECTRICAL, MECHANICAL, SIGNAL, COMMUNICATION)
CONSTRUCTION PERIOD
2012.12- 2017.3
SEOUL METRO LINE.9 PHASE.3 LOT NO.921
CLIENT
SEOUL URBAN INFRASTRUCTURE
TYPE
RAILWAY (EXTENSION: 1,742m(EXCAVATION 382m; SHIELD TBM 1,274m; NATM 86m))
CONSTRUCTION PERIOD
2009.12- 2018.12
MONORAIL FOR LINE 3 OF THE PANAMA METRO
CLIENT
MPSA(PANAMA METRO CORPORATION)
TYPE
RAILWAY(L=26.7km, MONORAIL CONSTRUCTION, INCLUDING 14 STATIONS AND 1 VEHICLE DEPOT) ※OUR SCOPE : AREA-270,000m2, VEHICLEDE POT CONSTRUCTION, MANAGEMENT BUILDING AND 17 OTHER BUILDINGS
CONSTRUCTION PERIOD
2021.2- 2025.8